Under the rain for week 8

The buildings and remaining boundary wall have been placed and marked, but now the rain is preventing the guys from digging... That should be the very last bad weather week, but when it's bad, it's really dull and impossible to work ! So the site is closed today. The tent has been put down to prevent further tearing, as the wind is really strong... and everybody sent home. That gives us time to work on the designs !


last week's markings


buuuh rain

R. the engineer could work on the foundations of the family cottages, good news, he's downsizing them, and designing them in stone now instead of the previously thought concrete ground beam. After our adjustment work session yesterday, he should have the plans ready very soon, and with that the list and quantity of necessary materials.

So now that this part is sorted, or almost, I'm working on the water sewage system design. 
And calling for volunteers among the Polytech students which are going to be on holidays for a month from Friday - maybe some of them would be interested in a free hands-on training in eco-construction ?
We could do with a bit of helping hands with all this.

Comments

Popular posts from this blog

Chantier au jour le jour

I've already talked about the difficulties to plan anything ahead here last year. On Wednesday late afternoon, the person in charge of the site while the boss is away informs that he will have to be away for the 2 coming days, as he has to attend a relative's funeral. Ok, I am the one remaining, I will then spend Thursday and Friday on site.  I'm also waiting for more info on the gardens to finish setting out the future alley. But the permaculture director just messaged me : she's been sick all night and won't be able to go anywhere today.

Week... 46 - Almost the roofs (this time for real) (I'm such an optimist)

I didn't realize I've waited for so long to post an update. It seems that the roofs have been under the works FOR EVER.  We had wished to get them done by the end of November, before the rains would start.  Well, something like 20 weeks later, now that the rainy season is ending, we still don't have the roof structures covered. Better doing it Necola's way : sit back and wait The contractor hasn't finished placing the designed (by structural engineers) structure, and then the tiles supplier, who is an engineer himself, wasn't happy with the structure at some places and asked the structural engineers to reinforce it. So now, we are in the final stages of putting that */&àçéè' structure up... My fingers are hurting, they've been crossed for too long now ;)   But something is happening ! At the end of the day, it's going to be beautiful and inspiring :)

Week 5 : The launch of CSEB making

So, yeah, this week saw the start of the production of our CSEB - Compressed Stabilized Earth Blocks, also called "SSB" for Stabilized Soil bricks, or BTC in French, for Blocs de Terre Comprimée (manque un S pour stabilisée mais bref).  They are much more eco-friendly than the fired bricks (using a looot of wood to get cooked) or concrete (using a loooot of (imported) cement), as these blocks should count only 5% of cement for the stabilization, and don't need any plaster or paint or any other layer on them at the end to be confortable and beautiful. So some soil has already been extracted and sieved, and kinda analyzed ( a bit too roughly unfortunately), we had a bag of cement ready, some water nearby, a large area for the curing was prepared, the machine was assembled and we were ready to start testing ! We made our first blocks on Monday afternoon, guiding the guys for the dry mixing, the wet mixing, the steps for the compression, the handling on the block...